1. Ferrovial
  2. Business Lines
  3. Projects

WVQ SL 8 Harris County in Houston, TX

Houston, Texas

  • 23972
    SY

    Remove concrete paving

  • 23476
    SY

    Excavation

  • 142078
    SF

    Reinforce Concrete Slab

  • 6437
    LF

    Drill Shaf

Widening of Beltway 8 North Loop West Hardy toll road to Aldine Westfield. This project added auxiliary lanes and widened bridges – IH 45 N to US 59 N.

Widening of Beltway 8 North Loop West Hardy toll road to Aldine Westfield. This project added auxiliary lanes and widened bridges – IH 45 N to US 59 N.

Major Work Items

  • Remove concrete paving – 23,972 SY
  • Excavation – 23,476 SY
  • Reinforce Concrete Slab – 142,078 SF
  • Drill Shaft – 6,437 LF
  • Retaining Walls – 35,710 SF
  • Rail Ty T551 – 11,915 LF
  • Remove Structure Pipe – 5,088 LF
  • Concrete Box Culverts – 4,218 LF
  • Manholes / Inlets – 55 EA

The Scope

  • Grading
  • Stabilization
  • Detours
  • Electrical
  • Signage
  • Striping
WVQ SL 8 Harris County, Houston

Our projects around the world

See more projects Jorge Chávez Airport, Peru

Jorge Chávez Airport, Peru

Discover the project
Santiago de Chile Metro's Line 6

Santiago de Chile Metro’s Line 6

Discover the project
Thames Tideway Tunnel. Tramo central

Thames Tideway Tunnel, Central Section

Discover the project
Google Play App Store