Environmental performance

We have designated environmental performance as one of our priorities in order to strengthen our capacities to offer infrastructure and services that respond to global challenges.

Environmental sustainability is playing an increasingly important role in  everything we do. Not only from a liability perspective or as a mechanism to manage a certain type of risk more efficiently, but also as a source of new ideas and business models.

In this sense,  we have strengthened our capacities to offer services and infrastructures that respond to global challenges, such as climate change, the energy crisis or the loss of biodiversity.

 We are committed to the sustainable development of society by reporting indicators such as CO2 emissions (see Carbon Footprint), water consumption and waste, and RCDs, among others . In addition,  we have and continue to set targets for improving our environmental performance and strengthening our climate strategy by developing infrastructure and services for a “green” low-emission economy that  is evidenced in our project portfolio.

Non hazardous waste, hazardous waste, CDW’s and waste recycling

Reducing the environmental impact

The high volumes of soil managed on work sites have encouraged us to set an objective of minimizing the impacts associated with this activity be reusing the soil.  We have therefore established an 80% target for soil reuse for 2020, using 2016 as the base year.

Reused soil in work sites

  2018 2019 2020
Materials reused at worksite (m3)

922,936

2,893,285

1,576,854

Topsoil reused (m3)

528,749

762,077

931,948

Material reused on site (m3)

14,336,346

12,059,463

15,889,312

Material sent to another work or authorized landfill (M3)

3,554,355

5,932,290

2,892,956

 

Waste by type and disposal method

  2016 2017 2018
Waste produced from construction and demolition(m³) 1.628.147  1.439.795  2.344.504
Total soil from excavation(m³) 19.759.576  27.612.500 19.363.051
Topsoil reused(m³) 558.310 1.458.280 922.936
Material sent to landfill outside the worksite(m³) 1.447.743 5.287.068 528.749
Material reused at worksite (m³) 11.692.839  15.498.439 14.336.346
Material sent to other worksite or authorized landfill(m³) 6.060.683 5.368.713 3.575.020

Non hazardous waste

We have also reduced the production of non-hazardous waste, reaching our target of a 2.5% annual reduction,  and with 2016 as the base year.

Non-hazardous Waste disposed (Tn)

  • 2016

    627,897

  • 2017

    683,842

  • 2018

    604,545

** Non-hazardous waste data reported in 2018 annual report include  161,740 Tn of waste managed but not produced by Ferrovial.

*The non-hazardous waste in 2016 has  been recalculated taking into account the contribution of the new companies acquired in order to improve the comparability of the data.

Hazardous waste

The objective that establishes a 5% annual reduction of hazardous waste generation has been met.

Hazardous waste generated (Tn)

  • 2017

    27,943

  • 2018

    18,419

Highlighted environmental performances

View the projects in which we have developed and are developing environmental actions.

Construction projects

view more Espiño Tunel

Espiño Tunnel

Discover the project
carretera Ferreries en Menorca ME-1

Environmental Protection within a…

Discover the project
brown bear portection in a tunnel construction

Protection of the Brown Bear During…

Discover the project
sunset heathrow airport

Heathrow Airport

Discover the project
Data Center Alcala

Telefónica Data Centre

Discover the project
Google Play App Store