WVQ SL 8 Harris County in Houston, TX

Houston, Texas

  • 23972
    SY

    Remove concrete paving

  • 23476
    SY

    Excavation

  • 142078
    SF

    Reinforce Concrete Slab

  • 6437
    LF

    Drill Shaf

Widening of Beltway 8 North Loop West Hardy toll road to Aldine Westfield. This project added auxiliary lanes and widened bridges – IH 45 N to US 59 N.

Widening of Beltway 8 North Loop West Hardy toll road to Aldine Westfield. This project added auxiliary lanes and widened bridges – IH 45 N to US 59 N.

Major Work Items

  • Remove concrete paving – 23,972 SY
  • Excavation – 23,476 SY
  • Reinforce Concrete Slab – 142,078 SF
  • Drill Shaft – 6,437 LF
  • Retaining Walls – 35,710 SF
  • Rail Ty T551 – 11,915 LF
  • Remove Structure Pipe – 5,088 LF
  • Concrete Box Culverts – 4,218 LF
  • Manholes / Inlets – 55 EA

The Scope

  • Grading
  • Stabilization
  • Detours
  • Electrical
  • Signage
  • Striping
WVQ SL 8 Harris County, Houston

Our projects around the world

See more projects Jorge Chávez Airport, Peru

Jorge Chávez Airport, Peru

Discover the project
Thames Tideway Tunnel. Tramo central

Thames Tideway Tunnel, Central Section

Discover the project
Viaducto de Erques en Tenerife

Barranco de Erques Arch Viaduct

Discover the project
Google Play App Store