1. Ferrovial
  2. Business Lines
  3. Projects

South Laredo WWTP 12 to 18 MGD Expansions, TX

Laredo, Texas

  • $
    22.1
    M

    value

  • 2019

    completion

The PLW Waterworks team installed a submersible pump at the existing Influent Pump Station and constructed new aeration basin splitter box and aeration basin number three.

Our team expanded the blower facility and electrical building, the return activated sludge (RAS) pump station with new pumps, chlorine contact basin, modify chlorine storage and feed building. Also, PLW constructed a new secondary clarifier number four and a secondary clarifier splitter box, an effluent sample building, and all associated site work, yard piping, generator, electrical and control improvements.

South Laredo WWTP 12 to 18 MGD Expansions

Our projects around the world

See more projects Jorge Chávez Airport, Peru

Jorge Chávez Airport, Peru

Discover the project
Thames Tideway Tunnel. Tramo central

Thames Tideway Tunnel, Central Section

Discover the project
Viaducto de Erques en Tenerife

Barranco de Erques Arch Viaduct

Discover the project
Google Play App Store